Celtins and Cemat grid connection of isolated systems



Link
cdm.unfccc.int


Abstract

The purpose of the project activity is the expansion of the Brazilian interconnected grid to isolated systems in the Brazilian states of Mato Grosso and Tocantins. The interconnection will result in the complete displacement of the previous fossil fuel power generation in the isolated systems by more efficient, less carbon intensive power generation from the interconnected grid.


Implementing Actor

CELTINS, CEMAT (Private sector)