Republic of Congo: Centrale Electrique du Congo

completed



Link
www.eni.com


Abstract

In 2010 eni built the Congo electric power station (CEC) with an installed capacity of 300 MW, fuelled by gas from the M’Boundi fi eld. Today Pointe Noire’s energy is supplied entirely by the CEC power station, whereas the surplus power that is not used at Pointe Noire is passed on to Brazzaville through the modernized high voltage network.


Implementing Actor

ENI (Private sector)